Logo Repositorio Institucional

Please use this identifier to cite or link to this item: https://dspace.ucuenca.edu.ec/handle/123456789/45950
Title: Septage treatment using the first stage of french vertical flow constructed wetlands: from the beginning to the closure of the system
Authors: Garcia Zumalacarregui, Jorge Alejandro
Narvaez Torres, Andrea Carolina
Alvarado Martinez, Andres Omar
Keywords: French system
Septage treatment
Vertical flow constructed wetlands
Percolate impounding
Start-up
Wetland system closure
metadata.dc.ucuenca.areaconocimientofrascatiamplio: 2. Ingeniería y Tecnología
metadata.dc.ucuenca.areaconocimientofrascatidetallado: 2.7.1 Ingeniería Ambiental y Geológica
metadata.dc.ucuenca.areaconocimientofrascatiespecifico: 2.7 Ingeniería del Medio Ambiente
metadata.dc.ucuenca.areaconocimientounescoamplio: 07 - Ingeniería, Industria y Construcción
metadata.dc.ucuenca.areaconocimientounescodetallado: 0712 - Tecnología de Protección del Medio Ambiente
metadata.dc.ucuenca.areaconocimientounescoespecifico: 071 - Ingeniería y Profesiones Afines
Issue Date: 2024
metadata.dc.ucuenca.volumen: Volumen 206
metadata.dc.source: Ecological Engineering
metadata.dc.identifier.doi: 10.1016/j.ecoleng.2024.107329
metadata.dc.type: ARTÍCULO
Abstract: 
The First Stage of French Vertical Flow Constructed Wetlands (FS-FVFCW) offers a sustainable solution for treating septage. The system operates through distinct phases: start-up, full operation and final rest. During full operation, factors such as feeding duration, rest periods and percolate impounding significantly affect performance. This study assessed the performance of a pilot-scale Modified FS-FVFCW in Northern Tropical Andes, from start-up to closure stages under three operational scenarios. These scenarios varied in planted/unplanted conditions and percolate drainage/impounding. A four-month start-up phase proved adequate for vegetation growth and adaptation, achieving over 50% COD removal efficiency. Percolate retention (impounding) during operation notably improved COD and TS removal, increasing efficiencies from 49% to approximately 90% for COD and from 39% to around 70% for TS. Plant presence contributed to mosquito control and odour reduction but had minimal impact on removal efficiencies. The pilot demonstrated significant dewatering potential, with sludge deposit samples showing water content below 76% across all scenarios after 24 h; and a 10% reduction in VS/TS ratio during the operational resting period. After a 5-month closure, the sludge deposit layer exhibited organic matter content similar to long-rested sludge, albeit with persistent faecal contamination.
URI: https://dspace.ucuenca.edu.ec/handle/123456789/45950
https://www.scopus.com/record/display.uri?eid=2-s2.0-85196531140&doi=10.1016%2fj.ecoleng.2024.107329&origin=inward&txGid=ced70f08930103805dcc9eb59ddd1f78
metadata.dc.ucuenca.urifuente: https://www.sciencedirect.com/journal/ecological-engineering
ISSN: 09258574
Appears in Collections:Artículos

Files in This Item:
File SizeFormat 
documento.pdf3.83 MBAdobe PDFView/Open


This item is protected by original copyright



Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

 

Centro de Documentacion Regional "Juan Bautista Vázquez"

Biblioteca Campus Central Biblioteca Campus Salud Biblioteca Campus Yanuncay
Av. 12 de Abril y Calle Agustín Cueva, Telf: 4051000 Ext. 1311, 1312, 1313, 1314. Horario de atención: Lunes-Viernes: 07H00-21H00. Sábados: 08H00-12H00 Av. El Paraíso 3-52, detrás del Hospital Regional "Vicente Corral Moscoso", Telf: 4051000 Ext. 3144. Horario de atención: Lunes-Viernes: 07H00-19H00 Av. 12 de Octubre y Diego de Tapia, antiguo Colegio Orientalista, Telf: 4051000 Ext. 3535 2810706 Ext. 116. Horario de atención: Lunes-Viernes: 07H30-19H00