Logo Repositorio Institucional

Por favor, use este identificador para citar o enlazar este ítem: https://dspace.ucuenca.edu.ec/handle/123456789/45950
Título : Septage treatment using the first stage of french vertical flow constructed wetlands: from the beginning to the closure of the system
Autor: Garcia Zumalacarregui, Jorge Alejandro
Narvaez Torres, Andrea Carolina
Alvarado Martinez, Andres Omar
Palabras clave : French system
Septage treatment
Vertical flow constructed wetlands
Percolate impounding
Start-up
Wetland system closure
Área de conocimiento FRASCATI amplio: 2. Ingeniería y Tecnología
Área de conocimiento FRASCATI detallado: 2.7.1 Ingeniería Ambiental y Geológica
Área de conocimiento FRASCATI específico: 2.7 Ingeniería del Medio Ambiente
Área de conocimiento UNESCO amplio: 07 - Ingeniería, Industria y Construcción
ÁArea de conocimiento UNESCO detallado: 0712 - Tecnología de Protección del Medio Ambiente
Área de conocimiento UNESCO específico: 071 - Ingeniería y Profesiones Afines
Fecha de publicación : 2024
Volumen: Volumen 206
Fuente: Ecological Engineering
metadata.dc.identifier.doi: 10.1016/j.ecoleng.2024.107329
Tipo: ARTÍCULO
Abstract: 
The First Stage of French Vertical Flow Constructed Wetlands (FS-FVFCW) offers a sustainable solution for treating septage. The system operates through distinct phases: start-up, full operation and final rest. During full operation, factors such as feeding duration, rest periods and percolate impounding significantly affect performance. This study assessed the performance of a pilot-scale Modified FS-FVFCW in Northern Tropical Andes, from start-up to closure stages under three operational scenarios. These scenarios varied in planted/unplanted conditions and percolate drainage/impounding. A four-month start-up phase proved adequate for vegetation growth and adaptation, achieving over 50% COD removal efficiency. Percolate retention (impounding) during operation notably improved COD and TS removal, increasing efficiencies from 49% to approximately 90% for COD and from 39% to around 70% for TS. Plant presence contributed to mosquito control and odour reduction but had minimal impact on removal efficiencies. The pilot demonstrated significant dewatering potential, with sludge deposit samples showing water content below 76% across all scenarios after 24 h; and a 10% reduction in VS/TS ratio during the operational resting period. After a 5-month closure, the sludge deposit layer exhibited organic matter content similar to long-rested sludge, albeit with persistent faecal contamination.
URI : https://dspace.ucuenca.edu.ec/handle/123456789/45950
https://www.scopus.com/record/display.uri?eid=2-s2.0-85196531140&doi=10.1016%2fj.ecoleng.2024.107329&origin=inward&txGid=ced70f08930103805dcc9eb59ddd1f78
URI Fuente: https://www.sciencedirect.com/journal/ecological-engineering
ISSN : 09258574
Aparece en las colecciones: Artículos

Ficheros en este ítem:
Fichero Tamaño Formato  
documento.pdf3.83 MBAdobe PDFVisualizar/Abrir


Este ítem está protegido por copyright original



Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.

 

Centro de Documentacion Regional "Juan Bautista Vázquez"

Biblioteca Campus Central Biblioteca Campus Salud Biblioteca Campus Yanuncay
Av. 12 de Abril y Calle Agustín Cueva, Telf: 4051000 Ext. 1311, 1312, 1313, 1314. Horario de atención: Lunes-Viernes: 07H00-21H00. Sábados: 08H00-12H00 Av. El Paraíso 3-52, detrás del Hospital Regional "Vicente Corral Moscoso", Telf: 4051000 Ext. 3144. Horario de atención: Lunes-Viernes: 07H00-19H00 Av. 12 de Octubre y Diego de Tapia, antiguo Colegio Orientalista, Telf: 4051000 Ext. 3535 2810706 Ext. 116. Horario de atención: Lunes-Viernes: 07H30-19H00