Please use this identifier to cite or link to this item:
https://dspace.ucuenca.edu.ec/handle/123456789/44967Full metadata record
| DC Field | Value | Language |
|---|---|---|
| dc.contributor.advisor | Valdez Apolo, Francisco Elias | - |
| dc.contributor.author | Creamer Pintado, Emilia Lisseth | - |
| dc.contributor.author | Creamer Pintado, Evelyn Paulina | - |
| dc.date.accessioned | 2024-08-01T15:56:30Z | - |
| dc.date.available | 2024-08-01T15:56:30Z | - |
| dc.date.issued | 2024-07-31 | - |
| dc.identifier.uri | https://dspace.ucuenca.edu.ec/handle/123456789/44967 | - |
| dc.description | La presente investigación tiene como propósito determinar el porcentaje de tiempo que se ahorra y la eficiencia generada al emplear metodologías BIM en la cuantificación de obra, mediante la comparación entre los métodos tradicionales y las herramientas BIM. Para alcanzar este objetivo se utilizarán datos disponibles tanto en línea como en formato físico y se seleccionarán estudios de arquitectura o constructoras que puedan proporcionar la información necesaria para este estudio. Además, se realizará un ejercicio práctico empleando ambas metodologías para comparar y corroborar los resultados obtenidos en las encuestas. La metodología que se aplicará será cuantitativa, con el fin de obtener el porcentaje de tiempo que se reducirá al utilizar herramientas BIM en el proceso de cuantificación. Finalmente, se analizarán los resultados obtenidos, y se establecerá una serie de recomendaciones para la implementación del BIM en el campo de la construcción. | en_US |
| dc.description.abstract | The purpose of this research is to calculate the percentage of time saved and the efficiency generated by using BIM methodologies in material quantity through comparison between traditional methods and BIM tools. To achieve this goal online and physical information will be used, and there will be a selection of architecture firms and construction companies that will provide information required for this research. Furthermore, an exercise will be developed using both methodologies to compare the results obtained on the surveys. The methodology applied will be quantitative, in order to get the percentage of time that can be reduced by using BIM tools at the moment of getting material quantities. Finally, results obtained will be analyzed, and recommendations for implementing BIM in the construction field will be established. | en_US |
| dc.description.uri | 0000-0001-9853-2811 | en_US |
| dc.format | application/pdf | en_US |
| dc.format.extent | 66 páginas | en_US |
| dc.language.iso | spa | en_US |
| dc.publisher | Universidad de Cuenca | en_US |
| dc.relation.ispartof | TA;1367 | - |
| dc.rights | Attribution-NonCommercial-NoDerivatives 4.0 Internacional | * |
| dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/4.0/ | * |
| dc.subject | Arquitectura | en_US |
| dc.subject | Proyectos arquitectónicos | en_US |
| dc.subject | Transformación digital | en_US |
| dc.subject.other | Clasificación de la Investigación::Arquitectura::Construcciones arquitectónicas | en_US |
| dc.title | Eficiencia en los procesos de cuantificación de obra: análisis comparativo entre el uso de la metodología BIM vs métodos tradicionales en proyectos arquitectónicos | en_US |
| dc.title.alternative | Eficiencia en los procesos de cuantificación de obra: Análisis comparativo entre el uso de la Metodología BIM vs Métodos tradicionales en proyectos arquitectónicos | en_US |
| dcterms.description | Arquitecto | en_US |
| dcterms.spatial | Cuenca, Ecuador | en_US |
| dc.rights.accessRights | openAccess | en_US |
| Appears in Collections: | Tesis de Pregrado | |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| Trabajo-de-Titulación.pdf | Versión presentada ( texto completo) | 3.84 MB | Adobe PDF | View/Open |
This item is protected by original copyright |
This item is licensed under a Creative Commons License
Centro de Documentacion Regional "Juan Bautista Vázquez" | ||||||||||
| ||||||||||
