Logo Repositorio Institucional

Por favor, use este identificador para citar o enlazar este ítem: https://dspace.ucuenca.edu.ec/handle/123456789/34456
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorSanango Fernández, Juan Bautista-
dc.contributor.authorAlvarado Morocho, Bayron Andrés-
dc.contributor.authorAndrade Palacios, Eduardo Sebastián-
dc.date.accessioned2020-06-08T20:48:24Z-
dc.date.available2020-06-08T20:48:24Z-
dc.date.issued2020-06-08-
dc.identifier.urihttp://dspace.ucuenca.edu.ec/handle/123456789/34456-
dc.descriptionEl presente trabajo se centra en la optimización del sistema de subtransmisión de la E.E.R.C.S. C.A. a través de la conmutación óptima de líneas para disminuir pérdidas, mejorar perfiles de voltaje y reducir las corrientes de cortocircuito; esto mediante la implementación de una rutina de programación elaborada en lenguaje Python que utiliza el programa Digsilent Power Factory (programa especializado de análisis de red), esta rutina realiza una búsqueda exhaustiva y determina la configuración óptima del sistema; el parámetro será la conmutación de 1 a 5 líneas a la vez. Como primera parte se realiza el análisis de la situación actual del sistema de subtransmisión de la E.E.R.C.S. C.A., determinando los parámetros que se tienen que mejorar; para esto se utiliza la herramienta MATPOWER (programa de análisis matemático), que es un paquete gratuito de MATLAB; por último, se realiza una comparación entre los dos programas utilizados. La segunda parte del estudio analiza como es el comportamiento del sistema con la inserción de una subestación de generación utilizando MATPOWER y la inserción de una subestación de reducción para distribución utilizando Digsilent Power Factory. Como tercera parte se realiza la optimización del sistema en el estado actual y se plantea una configuración con la inserción de una subestación de reducción para distribución, utilizando la rutina de búsqueda exhaustiva para conmutación óptima de líneas. Para finalizar se presenta un análisis del cambio de nivel de voltaje de 69kV a 138kV en una línea específica, la cual presenta parámetros a mejorar, con esto se pretende verificar la factibilidad de este cambio, determinando la configuración para que el sistema trabaje en óptimas condiciones.en_US
dc.description.abstractThe present work focuses on the optimization of subtransmision system the E.E.R.C.S. C.A., through line optimal switching to improve losses, voltage profiles and reduce short-circuit currents; this by implementing a programming routine developed in Phyton language that uses Digsilent Power Factory software (specialized software for network analysis), this routine performs an exhaustive search and determines the optimal configuration of the system; the parameter will be switching from 1 to 5 lines at a time. As a first part, is done the analysis of the current subtransmision system the E.E.R.C.S. C.A., determining the parameters that have to be improved; for this, the MATPOWER tool (mathematical analysis software) is used, which is a free the MATLAB package; finally, a comparison is made between the two software’s used. The second part of the study analyzes how the system behaves with the insertion of a generation substation using MATPOWER and the insertion of a reduction substation for distribution using Digsilent Power Factory. As a third part, the optimization of the system in the current state is carried out and a configuration is proposed with the insertion of a reduction substation for distribution, using the exhaustive search routine for optimal line commutation. Finally, an analysis of the change the voltage level from 69 kV to 138 kV in a specific line is presented, which presents parameters to improve, whit this intended to verify the feasibility of this change, determining the configuration so that the system works in optimal conditions.en_US
dc.formatapplication/pdfen_US
dc.language.isospaen_US
dc.publisherUniversidad de Cuencaen_US
dc.relation.ispartofseriesTE;469-
dc.rightsAttribution-NonCommercial-NoDerivatives 4.0 Internacional*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/*
dc.subjectIngeniería Eléctricaen_US
dc.subjectOptimización eléctricaen_US
dc.subjectNiveles de voltajeen_US
dc.subjectConmutación eléctricaen_US
dc.subjectLíneas de subtransmisiónen_US
dc.titleAnálisis de Factibilidad de la reconfiguración del sistema de subtransmisión de la E.E.R.C.S. C.A. por la Inserción de nuevas subestaciones y cambio de nivel de voltajeen_US
dc.typebachelorThesisen_US
dc.ucuenca.paginacion132 páginasen_US
dc.description.degreeIngeniero Eléctricoen_US
dc.description.cityCuenca, Ecuadoren_US
dc.ucuenca.id0301522892en_US
dc.ucuenca.idautor0104031810en_US
dc.ucuenca.idautor0104636295en_US
dc.ucuenca.correspondenciabayron.alvaradom@gmail.comen_US
dc.ucuenca.correspondenciasebastian.andrade.p@gmail.comen_US
Aparece en las colecciones: Tesis de Pregrado

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
Trabajo-de-Titulación.pdfVersión presentada (texto completo)7.57 MBAdobe PDFVisualizar/Abrir


Este ítem está protegido por copyright original



Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons

 

Centro de Documentacion Regional "Juan Bautista Vázquez"

Biblioteca Campus Central Biblioteca Campus Salud Biblioteca Campus Yanuncay
Av. 12 de Abril y Calle Agustín Cueva, Telf: 4051000 Ext. 1311, 1312, 1313, 1314. Horario de atención: Lunes-Viernes: 07H00-21H00. Sábados: 08H00-12H00 Av. El Paraíso 3-52, detrás del Hospital Regional "Vicente Corral Moscoso", Telf: 4051000 Ext. 3144. Horario de atención: Lunes-Viernes: 07H00-19H00 Av. 12 de Octubre y Diego de Tapia, antiguo Colegio Orientalista, Telf: 4051000 Ext. 3535 2810706 Ext. 116. Horario de atención: Lunes-Viernes: 07H30-19H00