Por favor, use este identificador para citar o enlazar este ítem:
https://dspace.ucuenca.edu.ec/handle/123456789/34321Registro completo de metadatos
| Campo DC | Valor | Lengua/Idioma |
|---|---|---|
| dc.contributor.author | Vásquez, Mario | - |
| dc.contributor.author | Flores, Cristian | - |
| dc.contributor.author | Bojorque Iñeguez, Jaime Asdrubal | - |
| dc.date.accessioned | 2020-05-15T23:37:10Z | - |
| dc.date.available | 2020-05-15T23:37:10Z | - |
| dc.date.issued | 2019 | - |
| dc.identifier.issn | 07177925 | - |
| dc.identifier.uri | http://dspace.ucuenca.edu.ec/handle/123456789/34321 | - |
| dc.identifier.uri | http://revistadelaconstruccion.uc.cl/index.php/RDLC/article/view/2023/2097 | - |
| dc.description | © 2019 Pontificia Universidad Catolica de Chile, Escuela de Construccion Civil. Highways have been and are built using Hot Mix Asphalt (HMA) as surface layer. The most common HMA design procedure is the Marshall Method, a method also used for quality control (QC) at the time of road construction. Due to several factors, sometimes it is not possible to sample the surface layer when constructed. When this occurs, QC is performed after construction by analyzing cores. Current regulations, however, fail having clear procedures regarding the collection and analysis of pavement cores after the complete placement of the asphalt mixture. For this reason, this study proposes a comparative analysis of Marshall parameters, mixture densities, and aggregates gradation obtained from specimens obtained during construction, versus cores samples extracted 30 and 60 days later. The research revealed that all the parameters measured on core samples, except flow, could be used to approve asphalt paving works after its construction. | - |
| dc.description.abstract | © 2019 Pontificia Universidad Catolica de Chile, Escuela de Construccion Civil. Highways have been and are built using Hot Mix Asphalt (HMA) as surface layer. The most common HMA design procedure is the Marshall Method, a method also used for quality control (QC) at the time of road construction. Due to several factors, sometimes it is not possible to sample the surface layer when constructed. When this occurs, QC is performed after construction by analyzing cores. Current regulations, however, fail having clear procedures regarding the collection and analysis of pavement cores after the complete placement of the asphalt mixture. For this reason, this study proposes a comparative analysis of Marshall parameters, mixture densities, and aggregates gradation obtained from specimens obtained during construction, versus cores samples extracted 30 and 60 days later. The research revealed that all the parameters measured on core samples, except flow, could be used to approve asphalt paving works after its construction. | - |
| dc.language.iso | es_ES | - |
| dc.source | Revista de la Construccion | - |
| dc.subject | Hot mix asphalt | - |
| dc.subject | Stability and flow | - |
| dc.subject | Quality control | - |
| dc.subject | Pavement construction | - |
| dc.subject | Marshall Test | - |
| dc.title | Marshall parameters for quality control of hot mix asphalt after pavement construction | - |
| dc.type | ARTÍCULO | - |
| dc.ucuenca.idautor | Sgrp-2228-2 | - |
| dc.ucuenca.idautor | 0102857885 | - |
| dc.ucuenca.idautor | Sgrp-2228-3 | - |
| dc.identifier.doi | 10.7764/RDLC.18.1.178 | - |
| dc.ucuenca.version | Versión publicada | - |
| dc.ucuenca.areaconocimientounescoamplio | 07 - Ingeniería, Industria y Construcción | - |
| dc.ucuenca.afiliacion | Vásquez, M., Investigador Independiente, Cuenca, Ecuador | - |
| dc.ucuenca.afiliacion | Bojorque, J., Universidad de Cuenca, Departamento de Ingeniería Civil, Cuenca, Ecuador | - |
| dc.ucuenca.afiliacion | Flores, C., Investigador Independiente, Cuenca, Ecuador | - |
| dc.ucuenca.correspondencia | Bojorque Iñeguez, Jaime Asdrubal, jaime.bojorque@ucuenca.edu.ec | - |
| dc.ucuenca.volumen | Volumen 18, Número1 | - |
| dc.ucuenca.indicebibliografico | SCOPUS | - |
| dc.ucuenca.factorimpacto | 0.27 | - |
| dc.ucuenca.cuartil | Q3 | - |
| dc.ucuenca.numerocitaciones | 61 | - |
| dc.ucuenca.areaconocimientofrascatiamplio | 2. Ingeniería y Tecnología | - |
| dc.ucuenca.areaconocimientofrascatiespecifico | 2.1 Ingeniería Civil | - |
| dc.ucuenca.areaconocimientofrascatidetallado | 2.1.5 Ingeniería de Transporte | - |
| dc.ucuenca.areaconocimientounescoespecifico | 073 - Arquitectura y Construcción | - |
| dc.ucuenca.areaconocimientounescodetallado | 0732 - Construcción e Ingeniería Civil | - |
| dc.ucuenca.urifuente | http://revistadelaconstruccion.uc.cl/index.php/RDLC/index | - |
| Aparece en las colecciones: | Artículos | |
Ficheros en este ítem:
| Fichero | Descripción | Tamaño | Formato | |
|---|---|---|---|---|
| documento.pdf | document | 564.67 kB | Adobe PDF | ![]() Visualizar/Abrir |
Este ítem está protegido por copyright original |
Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.
Centro de Documentacion Regional "Juan Bautista Vázquez" | ||||||||||
| ||||||||||

